ZBY-807Y stainless steel dedicated MoS2 lubricating coating_Zaibang lubrication material (Shanghai) Co., Ltd.
Your location:Home > Products > MoS2 coating

ZBY-807Y stainless steel dedicated MoS2 lubricating coating

2023-01-11 18:52:57
  • Brand MoS2 coating
  • Model ZBY-807Y   1kg  5kg
Introduction

1. Product introduction

This product is made of molybdenum disulfide and polymer adhesive as the main materials, mixed with high-efficiency curing agent, film forming agent, etc. It has excellent high temperature resistance, wear resistance, lubrication and high adhesion. It is specially used on the surface of stainless steel substrate. The coating film has the functions of temperature resistance, wear resistance, lubrication and self repair of micro pits.

Curing temperature: normal temperature 96hr or 120 ° C 30min

Temperature resistance of coating: - 10~200 ° C

Paint type: solvent type

Diluent: special solvent (ZBY-10 #)

2. Scope of application

Apply to the surface of stainless steel substrate.

3. Use Cases

Standard parts, screw rods, auto parts, etc.

4. Product indicators

Color/color number: gray-black

Gloss: Slightly bright

Mass solid content: 40 ± 1% PH: 7 ± 1.0

Viscosity: 40 ± 1 S (Cain 2 # cup)

Wet film: 30~60 μ m

Dry film: 20~40 μ m

Theoretical coating rate: 0.15-0.20kg/ m2@30 μ M dry film thickness

5. Construction conditions

Ambient temperature: more than 10

Ambient humidity: less than 70%

Construction method: brush coating, air spraying.

6. Operation instructions

6.1. Surface treatment of base material

6.1.1. Degreasing: the oil stain on the workpiece surface and gap must be removed.

6.1.2. After the substrate is nitrided, the surface residue shall be removed, cleaned and kept dry.

6.1.3. Do not touch the surface of the pin shaft with your fingers. Wear hair-free gloves to hold the pin shaft. If there is oil stain on the surface, it needs to be soaked or cleaned with solvent.

6.1.4 Put the workpiece into the oven or oven for preheating, control the temperature at 40~60 ° C (adjusted according to the ambient temperature), and keep it warm for more than 20 minutes for spraying.

6.2. Preparation of spraying equipment

Before using the spraying equipment, it is necessary to thoroughly clean the relevant equipment, such as spray gun, spray pot or storage tank. The recommended cleaning process is as follows:

6.2.1. Thoroughly clean the equipment with special diluent to remove the residual paint and residue inside.

6.2.2. Use special diluent or other soluble solvent to repeatedly clean the equipment (cleaning for more than 2 cycles).

6.3. Preparation of coating

6.3.1. Dispersion: Before using the coating, mix for 5-10 minutes, add an appropriate amount of diluent according to the actual situation, and then check

Measure its viscosity and disperse the coating evenly.

6.3.2. Filtration: The paint entering the spray can must be filtered with a 100 # filter screen to remove the solids that may be mixed in, so as to avoid blocking the gun or forming particles on the surface of the workpiece. The paint shall be adjusted again when used. The adjusted paint shall be used up at one time during construction.

6.4. Painting

Select a spray gun with a nozzle diameter of 1.0~1.5mm and a spraying pressure of 2~0.3MPa (2~3kgf/cm2). During spraying, control the distance between the nozzle and the base material to keep between 15~30cm. It is recommended to spray more than two times, and the thickness should be controlled within 20~30 μ m. Try to spray the surface evenly without sagging.

6.5. Drying and curing

The first curing method: dry at room temperature for 96 hours.

The second curing method: heat preservation at 30~60 ° C for 20 minutes, and heat preservation at 120~150 ° C for 10~30 minutes.

6.6. Cooling mode: after the workpiece film is solidified, furnace cooling and air cooling can be adopted for cooling. Please note that the uncooled film is in a soft film state, which is not easy to touch and collide, and does not have the properties described.

7. Precautions

7.1. The workplace must be well ventilated.

7.2. During the use of the coating, the container containing the coating shall be covered with a lid, sealed for use and storage.

7.3. This product may be unstable when the temperature changes. Please store at 5-30 ,

And the product shall be gently stirred or shaken regularly (about 1 month) at 20-30 to prevent sedimentation and condensation.

7.4. During normal spraying and back spraying, the surface of the workpiece must be sprayed and wetted, without drying.

8. Storage conditions

8.1. Keep away from direct sunlight at a temperature of 5~30 , and keep it for 12 months (unopened).

8.2. Package specification: 1kg, 5kg.

9. Waste discharge

9.1. It is recommended to clean the spray gun, spray irrigation and equipment with diluent. The diluent after washing can be filtered and stored for use when the viscosity of the coating is adjusted next time.

9.2. Do not discharge the paint and its cleaning residue into the waste water system, but put it into a special container for storage, and conduct professional treatment according to local and national environmental protection laws and regulations.

10. Emergency treatment

10.1. In case of leakage or overflow, please wash it with plenty of water.

10.2. If this product enters the eyes accidentally, immediately flush it with plenty of water for at least 15 minutes. If you feel pain, please see a doctor immediately.

10.3. If this product comes into contact with skin, please wash it with water and soap, and seek medical advice immediately if you feel unwell.

10.4. If you feel uncomfortable after inhaling spray, immediately transfer to a place with fresh air and seek medical advice.


More Products